If you have trouble viewing this mail, please click here for the html version.

参展商快讯

December 2019 www.semiconchina.org
中文版请点击这里


Your SEMICON China Team

Should you have further questions, please contact a SEMICON China team member listed below.

Exhibiting & Sponsorship


Ms. Hannah Zhao
Tel: +86.21.6027.8571
Email: [email protected]

Mr. Mortal Li
Tel: +86.21.6027.8569
Email: [email protected]

Ms. June Wu
Tel: +86.21.6027.8523
Email: [email protected]



Show Preparation
(Booth Construction, Freight Handling, Exhibitors Registration, etc)

Mr. Azir Xiang
Tel: +86.21.6027.8536
Email: [email protected]

Mr. Ryan Cai
Tel: +86.21.6027.8520
Email: [email protected]

SEMICON China 2020 Upates

SNIEC will send staffs to booths to ensure booth facilities are completely and properly installed. After inspection, SNIEC will provide the power normally by 12:00pm, Mar 17, 2020. For special cases, applications for early power supply, please contact MEGA EXPO or refer to Form 5 (Electrical Setting) for details.

Exhibitor who contracted Raw Space in SEMICON China 2020 are subjected to a Hall Management Fee (RMB 22/sqm) per rules published by SNIEC. All raw space exhibitors are required to pay the Hall Management Fee to official contractor. MEGA EXPO before February 14th, 2020. MEGA EXPO will transit it to SNIEC.

The maximum height for N1-N5, E7 raw space stand structure is 4.4 meters, and for T1-T3 raw space stand structure is 4 meters

SEMICON China 2020 Safety Measurament
All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.

All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).

Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Process or Section 5 in Exhibitor Service Manual.

Download Center
> Exhibitor Services Manual
  The manual will provide you with everything you need for a successful exhibition. Please take time to download and read through it, ensuring that the necessary actions are taken and the service forms are returned as required by their respective deadlines.
> SEMICON China 2020 Booth Information & Floorplan
  We encourage you to bookmark the FLOORPLAN so you can view it conveniently throughout the show cycle.
This Month

Exhibitor Password
Your Company name is: [[CompanyName]]
Your password is: [[Password]]
Use your password to:
-Log-in the Online Exhibitor Administrative Site to submit your company profile and products information. The earlier you submit your information, the more exposure opportunities you will have to the potential clients.

-Log-in the Online Exhibitor Service Center to register your company's Exhibiting Personnel before Mar 6, 2020. One person, one badge.

Back Wall Construction Guideline for Raw Booth
All raw booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit.

Exhibitor Update in previous months
Octorber Issue  November Issue