参展商快讯

January 2016 www.fpdchina.org
中文版请点击这里


Your FPD China Team

Should you have further questions, please contact a FPD China team member listed below.

Customer Service
(Exhibiting & Sponsorship)


Mr. Ivan Huang
Tel: +86.21.6027.8577
Email: [email protected]

Show Preparation
(Booth Construction, Freight Handling, Exhibitors Registration, etc)

Ms. Tina Zhang
Tel: +86.21.6027.8526
Email: [email protected]

Ms. Emma Liu
Tel: +86.21.5027.8530
Email: [email protected]

Technical Programs

Mr. Ivan Huang
Tel: +86.21.6027.8577
Email: [email protected]

FPD China 2016 Upates
The maximum height for all raw space stands is 4.4 meters.

All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.

All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).

Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Processor Section 5 in Exhibitor Service Manual.
Download Center
> Exhibitor Services Manual
  The manual will provide you with everything you need for a successful exhibition. Please take time to download and read through it, ensuring that the necessary actions are taken and the service forms are returned as required by their respective deadlines.
> FPD China 2016 FLOORPLAN
  We encourage you to bookmark the FLOORPLAN so you can view it conveniently throughout the show cycle.
This Month

Exhibitor Password
Your Company name is: [[Company Name]]
Your password is: [[Password]]
Use your password to:
-Log-in the Online Exhibitor Administrative Site to submit your company profile and products information. The earlier you submit your information, the more exposure opportunities you will have to the potential clients.
-Log-in the Online Exhibitor Service Center to register your company's Exhibiting Personnel.

Exhibit Prepration
About the exhibit prepration, please read SEMICON/FPD China 2016 Move-in/Move-out Notice
.

Hotel Reservaon
It will be better for you to reserve hotel as soon as possible because of the hotel peak-season during FPD China 2016. SEMI, working with our service partner Shanghai Vision Expo & Meeting Solutions Co., Ltd. has negotiated with several hotels to provide you favorable price. Please download Hotel Reservation Form or make your Reservation Online to book your room before Feb. 1, 2016.

Back Wall Construction Guideline for Decorated Booth
All decorated booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit.

China Display Conference / ASID 2016
This conference is co-organized by SEMI and SID (Society of Information Display), on March 15-16 at SNIEC concurrently with FPD China exhibition. It is a world-class technology communication event collaborated by the above two international FPD industrial association. For details please contact Mr.Ivan Huang of SEMI China as soon as possible, Tel: 021-60278577, Email: [email protected]

Deadline in January 2016
Form 1 - Name Fascia: Deadline: Jan.25, 2016.
Form 2 - EAC Application with booth drawing: Deadline: Jan.25, 2016.
Form 3 - Safety Construction Manager Registration Form: Deadline:Jan.25, 2016
Form 4 - Furniture,Lighting & Socket Rental: Deadline: Jan.25, 2016.
Form 5 - Electrical : Deadline: Jan.25, 2016.
Form 6 - Water & Compressed Air: Deadline: Jan.25, 2016.
Form 7 - Telephone & Internet: Deadline: Jan.25, 2016.
Form 8 - Location Plan: Deadline: Jan.25, 2016.
Form 9 - Upgraded Package Booth: Deadline: Jan.25, 2016.
Form 10 - Hanging Points: Deadline: Jan.25, 2016.
Form 11 - Building Approval: Deadline: Jan.25, 2016.
Form 14 - AV Equipment Rental Form: Deadline: Jan.25, 2016.
Form 16 - Request Form for an Invitation to PRC: Deadline: Jan.22, 2016.

Exhibitor Update in previous months
Octorber Issue November Issue December Issue