参展商快讯

January 2019 www.fpdchina.org
中文版请点击这里


Your FPD China Team

Should you have further questions, please contact a FPD China team member listed below.

Customer Service
(Exhibiting & Sponsorship)


Mr. Will Li
Tel: +86.21.6027.8525
Email: [email protected]

Show Preparation
(Booth Construction, Freight Handling, Exhibitors Registration, etc)

Ms. Tina Zhang
Tel: +86.21.6027.8526
Email: [email protected]

Ms. Florence Fu
Tel: +86.21.6027.8528
Email: [email protected]

Technical Programs

Mr. Will Li
Tel: +86.21.6027.8525
Email: [email protected]

FPD China 2019 Upates

Transportation Vehicles

Parking Permit and Queueing Numbermust be obtained before driving vehicles into the loading areas to load and unload the goods. Security staffs are authorized to stop those who fail to follow the guidance from entering. For detail information, you can refer to “Queueing Number & Parking Permit Notice”

★SNIEC will send staffs to booths to ensure booth facilities are completely and properly installed. After inspection, SNIEC will provide the power normally by 12:00pm, Mar 19, 2019. For special cases, applications for early power supply, please contact MEGA EXPO or refer to Form 5 (Electrical Setting) for details.

Exhibitor who contracted Raw Space in FPD China 2019 are subjected to a Hall Management Fee (RMB 22/sqm) per rules published by SNIEC. All raw space exhibitors are required to pay the Hall Management Fee to official contractor. MEGA EXPO before February 15th, 2019. MEGA EXPO will transit it to SNIEC.

The maximum height for N1-N5, E7 raw space stand structure is 4.4 meters, and for T1-T2 raw space stand structure is 4 meters.

FPD China 2019 Safety Measurament

-All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.


-All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).

-Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Process or Section 5 in Exhibitor Service Manual.

Download Center
> Exhibitor Services Manual
  The manual will provide you with everything you need for a successful exhibition. Please take time to download and read through it, ensuring that the necessary actions are taken and the service forms are returned as required by their respective deadlines.
> FPD China 2019 FLOORPLAN
  We encourage you to bookmark the FLOORPLAN so you can view it conveniently throughout the show cycle.
This Month

Exhibitor Password
Your Company name is: [[Company Name]]
Your password is: [[Password]]
Use your password to:
-Log-in the Online Exhibitor Administrative Site to submit your company profile and products information. The earlier you submit your information, the more exposure opportunities you will have to the potential clients.

-Log-in the Online Exhibitor Service Center to register your company's Exhibiting Personnel before Mar 8, 2019. One person, one badge.

Exhibit Prepration
About the exhibit prepration of N1-N5、E7, please read SEMICON/FPD China 2019 Move-in/Move-out Notice
About the exhibit prepration of T1、T2,please read SEMICON/FPD China 2019 T1&T2 notes.

Hotel Reservaon
It will be better for you to reserve hotel as soon as possible because of the hotel peak-season during FPD China 2019. SEMI, working with our service partner Shanghai Vision Expo & Meeting Solutions Co., Ltd. has negotiated with several hotels to provide you favorable price. Please download Hotel Reservation Form or make your Reservation Online to book your room before Feb. 15, 2019.

Back Wall Construction Guideline for Raw Booth
All raw booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit.

Recent Deadline
Name Fascia: Deadline: Feb.15, 2019.
EAC Application with booth drawing: Deadline: Jan.25, 2019.
Safety Construction Manager Registration Form: Deadline: Feb.15, 2019.
Furniture,Lighting & Socket Rental: Deadline: Feb.15, 2019.
Electrical Setting:dedline:Feb.15, 2019.
Water and Compressed Air
:dedline:Feb.15, 2019.
Telephone and Internet: Deadline: Feb.15, 2019.
Location Plan: Deadline: Feb.15, 2019.
Upgraded Package Booth: Deadline: Feb.15, 2019.
Building Approval: Deadline: Feb.15, 2019.
Hotel Reservation Form: Deadline: Feb.15, 2019.
AV Equipment Rental Form: Deadline: Jan.25, 2019.
Meeting Room Reservation: Deadline: Feb.15, 2019.
Request Form for an Invitation to PRC: Deadline: Feb.15, 2019.

Exhibitor Update in previous months
Octorber Issue November Issue December Issue