参展商快讯

January 2017 www.semiconchina.org
中文版请点击这里


Your SEMICON China Team

Should you have further questions, please contact a SEMICON China team member listed below.

Customer Service
(Exhibiting & Sponsorship)


Mr. Richard Zhang
Tel: +86.21.6027.8560
Email: [email protected]

Mr. Jesse Zhang
Tel: +86.21.6027.8558
Email: [email protected]


Show Preparation
(Booth Construction, Freight Handling, Exhibitors Registration, etc)

Ms. Tina Zhang
Tel: +86.21.6027.8526
Email: [email protected]

Ms. Florence Fu
Tel: +86.21.6027.8528
Email: [email protected]

SEMICON China 2017 Upates

Important notice:During SEMICON CHINA 2017, SNIEC will no long provide hanging structure service
With the increasing growth of SEMICON China, Some special designed booth are using hanging structure which brings serious safety issue but also much delay the move-in process. According to the regulation from the show venue (SNIEC), the venue will no long provide hanging structure service to all SEMICON China raw space exhibitors. All booths are required to be built from the ground only without any hanging structure. The booth height limit is at 4.4m as past for Hall W. The booth height limit is at 3.5m for Hall T1. This change will apply to all exhibitors without any exception.

Attention: Exhibitors in Hall T1 please refer to Outside Exhibition Hall Notice.

Hall Management Fee
Exhibitor who contracted Raw Space in SEMICON China 2017 are subjected to a Hall Management Fee (RMB 20/sqm) per rules published by SNIEC. All raw space exhibitors are required to pay the Hall Management Fee to official contractor. MEGA EXPO before March 5th, 2017. MEGA EXPO will transit it to SNIEC

SEMICON China 2017 Safety Measurament
-- All raw space exhibitor's contractor must submit the contractor's license. The electrician must has the electrician certificate and the copied documents should be the same as the electrician operating on the show site.

-- All raw space exhibitors must assign a full-time employee to be the safety construction manager to coordinate safety construction and monitor the entire working process. Please finish and return the Form 3 (Safety Construction Manager Registration Form).

-- Exhibitors who rent raw space can appoint their own contractors to set up the booth. Please ensure you and your contractor read and observe all the rules & regulations in the 《Safety Construction Guideline》. For details please refer to EAC Inspection & Move-in Processor Section 5 in Exhibitor Service Manual.

Download Center
> Exhibitor Services Manual
  The manual will provide you with everything you need for a successful exhibition. Please take time to download and read through it, ensuring that the necessary actions are taken and the service forms are returned as required by their respective deadlines.
> SEMICON China 2017 Booth Information & Floorplan
  We encourage you to bookmark the FLOORPLAN so you can view it conveniently throughout the show cycle.
This Month

Exhibitor Password
Your Company name is: [[Company Name]]
Your password is: [[Password]]
Use your password to:
-Log-in the Online Exhibitor Administrative Site to submit your company profile and products information. The earlier you submit your information, the more exposure opportunities you will have to the potential clients.

-Log-in the?Online Exhibitor Service Center?to register your company's Exhibiting Personnel.

Exhibit Prepration
About the exhibit prepration, please read SEMICON/FPD China 2017 Move-in/Move-out Notice
.

Hotel Reservation
It will be better for you to reserve hotel as soon as possible because of the hotel peak-season during SEMICON China 2017. SEMI, working with our service partner Shanghai Vision Expo & Meeting Solutions Co., Ltd. has negotiated with several hotels to provide you favorable price. Please download Hotel Reservation Form or make your Reservation Online to book your room before Feb. 6, 2017.

Back Wall Construction Guideline for Decorated Booth
All decorated booths, except island configurations, must provide a full back wall, minimum of 2.4 meters (8”) in height. All exposed walls must be finished on all sides at the expense of the exhibitor who owns the walls. All exposed wall areas or exposed structures must be covered by white PVC cloth without any break, contamination, graphics or texts. If the back wall did not meet the above requirements, penalty will be deducted from the construction deposit.

CSTIC 2017
On March 12-13, 2017, semiconductor industry executives and technical experts from across the world will converge at Shanghai for the annual China Semiconductor Technology International Conference (CSTIC).
For more information, please visit the conference site.

Deadline in January 2017
Form 1 - Name Fascia: Deadline: Jan.18, 2017.
Form 2 - EAC Application with booth drawing: Deadline: Jan.18, 2017.
Form 3 - Safety Construction Manager Registration Form: Deadline: Jan.18, 2017.
Form 4 - Furniture,Lighting & Socket Rental: Deadline: Jan.18, 2017.
Form 5 - Electrical : Deadline: Jan.18, 2017.
Form 6 - Water & Compressed Air: Deadline: Jan.18, 2017.
Form 7 - Telephone & Internet: Deadline: Jan.18, 2017.
Form 8 - Location Plan: Deadline: Jan.18, 2017.
Form 9 - Upgraded Package Booth: Deadline: Jan.18, 2017.
Form 11 - Building Approval: Deadline: Jan.18, 2017.
Form 14 - AV Equipment Rental Form: Deadline: Jan.18, 2017.
Form 16 - Request Form for an Invitation to PRC: Deadline: Jan.20, 2017.

Exhibitor Update in previous months
September Issue   Octorber Issue  November Issue
December Issue